Smart Solar & InvertersStop paying huge electricity bills every month and turn your rooftop into a money-saving asset.
Perfect for factories, warehouses & commercial buildings.
Indicative — ₹50,000/kW turnkey cost, 120 units/kW/month generation, ₹9/unit commercial tariff. Actual numbers depend on your load pattern, tariff slab and state DISCOM policy.
Three ways solar pays for itself.
Commercial and industrial solar has three separate return streams: monthly bill savings, accelerated depreciation, and GST input credit. Stack them together and payback drops to 3–5 years for most businesses.
60–80% lower monthly power bill
From day one · net-metered
Solar covers your daytime commercial load — the peak-tariff hours when you pay the most. A 100 kW plant on a factory running one shift typically wipes out ₹65,000–₹80,000 of monthly billing.
40% Accelerated Depreciation, Year 1
Section 32, Income Tax Act
Solar plants qualify for 40% depreciation in the first year — a huge tax shield that recovers a large chunk of your investment before the panels have even paid back a full year of savings.
18% GST fully creditable
Input Tax Credit for GST-registered businesses
The 18% GST on your solar EPC contract is available as Input Tax Credit — offsetting your GST output liability. For most businesses, this brings the effective plant cost down by another 15%.
After payback you get 20+ years of essentially free electricity — a 5x to 7x lifetime ROI on CAPEX plants. Zero-CAPEX PPA structures give you day-one savings with no investment at all.
Four steps. We handle every last approval.
Free site feasibility
Our engineer visits your premises, measures roof / land area, checks shadow patterns and audits your last 12 months of bills — at no cost.
Design + techno-commercial
We size the plant, model your ROI under both CAPEX and OPEX / PPA scenarios, and file the DISCOM feasibility application on your behalf.
Installation in 45–75 days
MNRE-approved panels and string inverters on hot-dip galvanised structures. Full electrical work, safety commissioning and inspection reports handled by us.
Handover + 5-yr O&M
Grid sync, net-meter installation, joint commissioning report. Remote generation monitoring plus quarterly cleaning and diagnostics for the first five years.
A ₹1L monthly bill pays back in under 3.5 years.
A 100 kW rooftop plant on a small factory or hotel. Effective post-tax capex is around ₹36 lakh — recovered from bill savings in 3.4 years, then 22 more years of essentially free power.
- 25-year panel performance warranty
- 10-year inverter warranty
- 5-year O&M included free
- Remote generation monitoring (24 × 7)
| Plant capacity | 100 kW rooftop, grid-tied |
| Monthly bill before (₹) | ₹1,00,000 / month |
| Turnkey EPC cost | ₹50,00,000 |
| Less: GST input credit (18%) | − ₹7,62,712 |
| Less: Accelerated Depreciation, Year 1 | − ₹6,00,000 |
| Effective post-tax cost | ₹36,37,288 |
| Year-1 electricity savings | ₹10,80,000 |
| Simple payback (post-tax) | 3.4 years |
| 25-year lifetime savings | ₹2.7 Cr+ |
500+ MW installed. Zero compromise on quality.
MNRE-empanelled EPC
We install MNRE-approved Tier-1 modules — Vikram, Waaree, Adani, Tata — with 25-year performance warranty and 12-year product warranty.
500+ MW delivered
Live installations across factories, hotels, hospitals, cold storages, poultry farms and warehouses. References available on request.
CAPEX or OPEX / PPA
Own the plant and claim all tax benefits, or pay ₹0 upfront and buy power at ₹4–5/unit under a 15–25 year PPA. Both structures fully engineered by us.
DISCOM & net-meter liaison
Feasibility, sanction, agreement, meter installation, HT/LT connection paperwork — we handle every state DISCOM interface end-to-end.
5-year O&M included
Quarterly panel cleaning, module diagnostics, inverter servicing and 24×7 remote monitoring — bundled free with every commercial plant.
80% generation guarantee
Contractual annual generation guarantee at ≥ 80% of design output. Below that, we top up the shortfall in cash — every year for 25 years.
Everything you need to know about commercial solar.
Book your free site feasibility.
Send us your details — we'll come back with a design, cost, and 25-year cash-flow model within 48 hours.
Book your free site feasibility this week.
Send us the last three months of your electricity bills and your rooftop / land photos. We'll come back with a design, cost, and 25-year cash-flow model within 48 hours.